Which system is suited for large-scale industrial control, replacing the control server?

Get more with Examzify Plus

Remove ads, unlock favorites, save progress, and access premium tools across devices.

FavoritesSave progressAd-free
From $9.99Learn more

Prepare for the WGU ITAS6291 D488 Cybersecurity Architecture and Engineering exam. Use flashcards and multiple-choice questions, each with explanations and guidance. Master your knowledge and excel in your exam!

The appropriate choice for large-scale industrial control, particularly in scenarios where the control server is being replaced, is the Supervisory Control and Data Acquisition (SCADA) system. SCADA systems are designed to support the monitoring and control of industrial processes over vast geographic areas, making them ideal for applications such as water treatment plants, electrical grid management, and other large-scale operations.

SCADA effectively collects real-time data from remote locations, allowing operators to monitor conditions, control processes, and troubleshoot from a centralized location. It integrates various devices and systems, providing a comprehensive overview that enhances decision-making and operational efficiency. This capability is crucial for industrial environments that require high reliability and extensive data collection and analysis.

In contrast, while a Distributed Control System (DCS) is also used for process control, it is typically more localized and suited for continuous manufacturing processes. A Programmable Logic Controller (PLC) is effective for discrete control but is generally not as capable as SCADA for large-scale integration. HVAC systems are specialized for environmental control in buildings and are not focused on large-scale industrial processes. Therefore, SCADA stands out as the system best equipped for extensive industrial control when replacing a control server.